📧 claire@jsltupe.com · ☎ +86 189 6300 3803 · MOQ from 1 piece · FOB Qingdao
Home›Blog›How to Install Bollard Facing Pads with Counter-Bored Bolting
How-to Guide · JSLT Marine

How to Install Bollard Facing Pads with Counter-Bored Bolting

Practical step-by-step guide based on field experience. Send your DWG and we quote within 24 hours.

Overview

This guide covers the practical steps to install bollard facing pads with counter-bored bolting. JSLT Marine produces engineering plastic components in UHMWPE, HDPE, PA, POM and PTFE — full-process fabrication from raw sheet to CNC-machined parts.

Step-by-step procedure

  1. Mark bolt positions. Transfer hole pattern from pad to bollard; check clearance.
  2. Drill and tap bollard. Use stainless inserts for sea environment; depth = 1.5× bolt diameter.
  3. Mount pad with washers. Mechanical fastening only; large washers spread load.
  4. Torque progressively. Three-step torque pattern prevents pad warping.
  5. Inspect after first storm. Re-torque any loose bolts; verify pad seating.

Need help?

Our engineering team reviews drawings within 24 hours. We have shipped to 80+ countries across 4 continents and hold ISO 9001 certification.

Get a Quote in 24 Hours

Send your DWG/DXF/PDF/STEP files to claire@jsltupe.com — we reply within 24 h with unit cost, lead time, and FOB Qingdao shipping option.

📧 claire@jsltupe.com · ☎ +86 189 6300 3803 · MOQ from 1 piece · Quote on request

Contact Us